Skip to content
Angie Energy

Power your campus before the grid arrives.

Bridge-to-grid power for data centers: 25 MW ISO per unit, behind the meter, producing within 7 days once the site is ready and the equipment is on site.

Two 25 MW mobile gas turbine units supplying a data center campus at sunset

The challenge

The building is ready. The grid is not.

New grid connections can take years, while halls, cooling and IT load are ready far sooner. Every month without power is a month without revenue.

How Angie Energy solves it

  1. 01

    Speed to power

    Producing within 7 days once the site is ready and the equipment is on site.

  2. 02

    Bridge to grid

    Run on our units until your utility connection is live.

  3. 03

    Scale with your load

    25 MW ISO per unit. Add units as your IT load grows.

  4. 04

    Redundancy

    Install more units than you need, so one can be serviced while the others carry the load.

  5. 05

    Behind the meter

    Your own power plant on your site, independent of grid constraints.

  6. 06

    Plug and play

    Two trailers, no foundation, no concrete pad. Position, connect, power on.

The figure that matters

25MWISO1

Per unit. Add units to scale.

1 ISO rating. Output varies with frequency, ambient temperature and pressure.

Two 25 MW mobile gas turbine units supplying a data center campus at sunset

Lease or PPA

Your terms.

Flexible terms for temporary or permanent power.

Lease
Bridging power until your grid connection is live, on flexible terms.
PPA
A full range of services, including fuel sourcing, management and guaranteed kW output. Temporary or permanent power.

How much power do you need, and where?

Tell us about your site. We’ll tell you how fast we can power it.